How jurisdiction feasibility scores are built

A transparent guide to the evidence, weights, confidence signals, and hard-stop conditions behind every AHJ score.

6 weighted categories16 research flows5 red-flag caps0–100 favorability scale
01

Executive summary

Higher always means more favorable for development.

Each AHJ receives one composite score built from six category scores. Categories are weighted averages of their underlying research flows. Missing evidence is excluded or completeness-adjusted; it is never silently treated as favorable. Catastrophic conditions can cap the result after the weighted score is calculated.

02

How scoring works

The calculation is deterministic. Research agents produce evidence and flow scores; the arithmetic below produces the displayed result.

1

Adjust each flow for completeness

A flow with partial evidence is pulled toward its neutral baseline so thin research cannot dominate the model. A flow with no usable score is excluded.

adjusted = neutral + completeness × (raw − neutral)
2

Roll flows into category scores

Each category is a weighted average of the available adjusted flow scores. Weights are renormalized when a flow has no data.

category = Σ(adjusted flow × flow weight) ÷ Σ(available weights)
3

Blend categories, then apply caps

The six available category scores produce the composite. Any verified red flag is applied afterward, and the tightest triggered cap wins.

final = min(weighted composite, triggered red-flag caps)

Default category blend

25% Regulatory + 23% Grid Readiness + 15% Community + 13% Water + 13% Environment + 13% Incentives

03

The six categories

Regulatory

25% of composite

Can you legally build here, and how fast?

How easy the jurisdiction is to entitle in — approval route, code trajectory, entitlement speed, and development standards.

Approval Simplicity · 30%Policy Favorability · 30%Entitlement Velocity · 25%Design Flexibility · 15%

Grid Readiness

23% of composite

Can you get power, and at what cost?

Whether you can get power and at what cost — interconnection queue, energization timeline, and large-load tariff terms.

Grid Readiness · 60%Power Economics · 40%

Community

15% of composite

Will stakeholders fight you?

Political and social risk — voting record, organized opposition, local pipeline saturation, and social sentiment.

Voting History · 35%Public Opposition (Data Centers) · 20%Market Saturation · 20%Social Sentiment · 15%Public Opposition (Industrial) · 10%

Water

13% of composite

Will the bodies that approve water use let you draw it?

Whether the bodies that approve water use will let you draw it. An enacted water moratorium caps the overall score.

Water Sentiment · 100%

Environment

13% of composite

Are there physical or environmental constraints?

Environmental constraint and hazard exposure — species, wetlands, contamination, floodplains, and natural-hazard risk.

Environmental Clearance · 65%Hazard Exposure · 35%

Incentives

13% of composite

How heavy is the tax and cost burden?

Financial load and upside — structural tax burden plus discretionary incentives.

Tax Burden · 55%Incentives · 45%
04

Score interpretation

75–100Highly feasibleThe jurisdiction is broadly supportive and the approval path is comparatively predictable.
55–74FeasibleThe project is workable, with one or more issues that require active management.
40–54ConstrainedMaterial headwinds may add conditions, cost, opposition, or schedule risk.
25–39ChallengingSubstantial barriers make delivery uncertain without a specific mitigation strategy.
0–24Not feasibleA binary blocker or severe jurisdiction risk makes another site the default recommendation.
05

Red-flag caps

A weighted average can hide a binary blocker. Caps prevent strength in unrelated categories from averaging away a condition that can stop the project.

DC use prohibited by codescore ≤ 10
Court injunction blocking DC permitsscore ≤ 15
Active enacted DC moratoriumscore ≤ 15
Active enacted water moratoriumscore ≤ 15
No viable interconnection for 10+ yearsscore ≤ 25

Example: an enacted data-center moratorium caps the jurisdiction even when incentives, power, and entitlement velocity are otherwise favorable.

06

Confidence is separate from feasibility

Confidence communicates how much trust to place in the score, not whether the jurisdiction is favorable. It reflects evidence completeness and the quality of the completed research run. It never multiplies or inflates the feasibility score.

High

Broad, current evidence supports the scored pattern.

Medium

Useful directional evidence exists, with material gaps to review.

Low

Treat the score as preliminary until missing evidence is resolved.

07

What the score does not replace

Current conditions, not certainty

Political environments, ordinances, utility queues, and public sentiment can change quickly. Re-check before major commitments.

Public evidence, not perfect information

Some jurisdictions publish far more than others. Low confidence can reflect thin records rather than an unfavorable jurisdiction.

Jurisdiction context, not site-level diligence

Parcel geometry, infrastructure, adjacency, project design, and timing can materially change the result for an individual site.

PermitPortal methodology memoVersion 2.2 · Updated June 2026